Descargar Imprimir esta página

American Standard Princeton 2390.202.ICH Instrucciones De Instalación Cuidado Y Mantenimiento página 2

C/modelos de rebosadero integral

Publicidad

Idiomas disponibles

Idiomas disponibles

2
DRAIN INSTALLATION
1
Remove Lift and Turn Stopper and Tailpiece Assembly from box and check that all parts are included. Remove Lift
and Turn Stopper Assembly from Tailpiece by setting Stopper to closed position, and turning Stopper Knob
counter-clockwise. (Re-install Stopper after Drain installation is completed.)
2
Apply plumbers putty around drain hole and pipe thread compound on threaded end of tailpiece.
3
Set Tailpiece in drain hole. (Lift and Turn Stopper Assembly should be removed, and reinstalled after tub
installation is completed.)
4
From underside of tub: Place Rubber Wedge Seal on Tailpiece, small end toward tub, and center in hole, place
Brass Washer on Tailpiece, and thread on Locking Nut, flange side first. Tighten Locking Nut to obtain a uniform
seal between Wedge Seal and hole in tub. Tighten 1/2 to 1 turn beyond hand tight.
DO NOT OVERTIGHTEN!
Final hook up to tub waste can be made using either internal threads in Tailpiece (1-1/2 tubing 1-1/2—28 thd.), or
external threads on Tailpiece (1-1/2—11-1/2 NPSM) for appropriate tub fittings.
3
SET
TAILPIECE
1
TURN TO
REMOVE
STOPPER IN
CLOSED POSITION
(UNSCREW STOPPER ONCE IN
CLOSED POSITION TO REMOVE)
LIFT AND TURN STOPPER ASSEMBLY
APPLY PIPE JOINT
COMPOUND TO
THREADS
APPLY PLUMBERS
PUTTY
STOPPER IN
OPEN POSITION
2
2
ASSEMBLE AND
4
TIGHTEN
- 2 -
STOPPER KNOB
STOPPER ASSEMBLY
TAILPIECE
RUBBER DRAIN SEAL
BRASS DRAIN WASHER
BRASS DRAIN NUT
791174-400 Rev. R 3/17

Publicidad

loading