Descargar Imprimir esta página

Opex Omation 210 Envelopener Serie Manual Del Operador página 48

Publicidad

2.3.4. Dielectric and ground test label
Rear of the machine (Figure 2-4).
Location:
To inform personnel that the ground points in the machine are well
Purpose:
connected between each other and it has passed the ground bond test.
Figure 2-4: Dielectric and Ground Test label P24838-01
24
Safety
Omation® Series 210™ Envelopener® Operator Manual
OPEX Corporation

Publicidad

loading

Productos relacionados para Opex Omation 210 Envelopener Serie