Descargar Imprimir esta página

Opex Omation 210 Envelopener Serie Manual Del Operador página 90

Publicidad

3. Continue lifting the cover off on the left side to remove it (Figure 4-11).
Note: If you were referred to this section from "Adjusting Cutter Depth,"
to return to that section.
Click here
4. Lift the Nip arm wheels to clean under them (Figure 4-12).
Operation
Omation® Series 210™ Envelopener® Operator Manual
Figure 4-11: Lifting the Nip arm cover
Figure 4-12: Cleaning under the nip wheels
OPEX Corporation
45

Publicidad

loading

Productos relacionados para Opex Omation 210 Envelopener Serie