Descargar Imprimir esta página

Kohler K-8207 Guia De Instalacion página 4

Grifería de base para fregadero adicional
Ocultar thumbs Ver también para K-8207:

Publicidad

Idiomas disponibles

Idiomas disponibles

Escutcheon
End Body
Washer
Nut
2. Install the Valve Body
Remove the washer and nut from each valve body. Save for later
use.
Apply a bead of plumbers putty or other sealant to the underside
of escutcheons according to the putty manufacturer's instructions.
NOTE: The valve body marked "COLD" with a blue tape must be
installed into the mounting hole on the right as viewed from the
front of the sink.
From the top of the sink, insert the valve bodies into the
mounting holes.
From the underside of the sink, slide a washer and a nut onto
each valve body.
Rotate each valve body until the copper tubing faces towards the
outside of the sink.
Firmly hold the valve bodies in place and securely tighten the
nuts with a wrench. Do not overtighten.
Remove any excess putty or sealant.
113032-2-AB
Washer
Nut
Copper
Supply Tube
4
Kohler Co.

Publicidad

loading