Waeco AirCon Service Center ASC 1300 G Instrucciones De Uso página 112

Estación de mantenimiento de aire acondicionado
Ocultar thumbs Ver también para AirCon Service Center ASC 1300 G:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Operation
4. Press ENTER to confirm both settings.
I
NOTE
The air conditioning system is drained completely by the vacuum pump.
This is used to remove any remaining carrier gases or moisture, and to
prepare the air conditioning system for the filling process.
8.8.3
Filling process
1. Enter the preferred settings and press ENTER to confirm.
2. If "Filling phase" has been selected, enter the required value, oth-
erwise continue with chapter "Selecting connections" on page 113.
3. Enter the refrigerant oil quantity.
4. Press the cursor key .
5. Enter the additive quantity.
6. Press the cursor key .
7. Enter the refrigerant quantity.
8. Press ENTER to confirm all settings.
I
NOTE
 If extraction is taking place in the same process sequence, the
quantity of fresh oil is counted as an additional filling quantity, and is
added to the drained oil quantity extracted beforehand. If this value
is set to 0, exactly the quantity of oil which was extracted will be filled
again.
 To add fresh oil or UV additive, a vacuum process must be per-
formed in the same process sequence. If no vacuum process has
been selected, only refrigerant can be selected in the filling menu.
112
Vacuum time
Leak Test
ENTER-OK STOP-EXIT
Filling phase?
ENTER-OK STOP-EXIT
PAG oil
UV tracer
Refrigerant
ENTER-OK STOP-EXIT
AirCon Service Center
min.
20
min.
4
Yes
No
ml.
5
ml.
7
g.
500
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido