Instructions
Installation Options
The following sections offer optional steps to complete installation.
Mounting to the Wall
1 At desired location on wall, use the spacing shown in
the graphic below to mark four level drill positions
for the cabinet holes.
Concrete wall: use a 15/64" (6 mm) bit to drill holes
2.4 in. (60 mm) deep at marks.
Wood-stud walls: use a 15/64" (6 mm) bit to make
pilot holes 2.4 in. (60 mm) deep at marks.
Stacking the Units — NOTE: Make sure all power is cut off from unit!
Stacking material not included; refer to website.
1 Unscrew the screws on the power box.
2 Slide the power box out.
3 Align the stacking holes on the top and bottom of
the cabinets.
16in. (406.4 mm)
2 Install included screws into holes so they protrude
0.4 in. (10 mm) from the wall.
3 Position cabinet holes over wall screws and hang
cabinet on them. Installation is complete.
4 Tighten screws (not included) into both cabinets
from the ceiling of the bottom cabinet.
5 Reinstall the power box with its screws.
2 in.
(50mm)
NOTE: a 13 mm
(0.51 in.) gap exists.
English
5