Descargar Imprimir esta página

Progress Lighting Fresno P2548 Serie Manual De Instalación página 9

Ventilador de techo

Publicidad

Idiomas disponibles

Idiomas disponibles

Finishing the Installation
Step 1. Tuck connections neatly into ceiling outlet
box.
Step 2. Slide the canopy up to mounting bracket
and place the key hole on the canopy over the screw
on the mounting bracket, turn canopy until it locks
in place at the narrow section of the key holes. (Fig.
9)
Step 3. Align the circular hole on canopy with the
remaining hole on the mounting bracket, secure by
tightening the two set screws. Note: Adjust the
canopy screws as necessary until the canopy and
canopy cover are snug.
WARNING
Make sure the notch on the hanging bracket properly
sits in the groove in the hanger ball before attaching
the canopy to the bracket by turning the housing until
it drops into place.
Outlet box
Hanger
bracket
Canopy cover
Figure 9
Attaching the Fan
Blades
Insert the blade through the slot in housing.
Align holes in blade and motor and secure with
Screws
3 screws and fiber washers. Repeat process
with the other blades. (Fig. 10)
Canopy
Figure 10
Slot
Blade
Fiber
washer
Screws
6.

Publicidad

loading

Este manual también es adecuado para:

Fresno p2548-0930kFresno p2548-2030kFresno p2548-3030k