Connecting the Communication Cable (Terminal Block) | Conexión del cable de comunicación
(bloque de terminales) | Raccordement du câble de communication (bornier)
The communication cables for battery, meter, EMS, dry contact, and emergency stop I/O are connected in the
same way. The following illustration shows an example of connecting battery communication cable.
6-8mm (0.24-0.31in)
6-8mm (0.24-0.31in)
2
• Add a smart meter in the PV system if there is no ABD box.
GEH, GEC
inverter
1
Notice
GMK120
Load
22
Grid