Descargar Imprimir esta página

Sauder worksense Mason Peak Serie Instrucciones De Montaje página 24

Ocultar thumbs Ver también para worksense Mason Peak Serie:

Publicidad

Step 18
å
Carefully lay your unit onto its front edges. We have provided a Nail Holder tool to use in this step for proper positioning of
the NAILS. Please refer to the parts of the Nail Holder as the bead, offset edge, and nail slot as shown in the diagram.
å
Diagram 1. Place the BACK (S) into the lower edge of the RIGHT END (A) with the top edge of the BACK (S) against the
lower edge of the TOP (C).
å
Diagram 2. Place the bead of the Nail Holder down between the BACK (S) and LEFT END (B) 2-1/2" from the corner. Place
a NAIL (1N) into the nail slot of the Nail Holder. Tap the NAIL through the BACK and into lower edge of the LEFT END.
Remove the Nail Holder from the NAIL and completely tap the NAIL in with your hammer. Finish fastening the BACK to
the LEFT END with the hammer and Nail Holder placing NAILS approximately 5-1/4" apart.
å
Repeat this step to fasten the BACK (S) to the RIGHT END (A).
å
Diagram 3. Fasten the BACK (S) to the BOTTOM (N) using the NAILS (1N) and Nail Holder. The NAILS should be 2-1/2"
from the corners and 6" apart.
å
Repeat this step to fasten the BACK (S) to the TOP (C).
NAIL
(20 used in this step)
Lower edge
1.
Page 24
Nail Holder
1N
C
A
N
Offset edge
Nail slot
Bead
B
S
427836
2-1/2"
2.
5-1/4"
Bead
Bead
3.
6"
Bead
www.sauder.com/officeservice
2-1/2"
Bead

Publicidad

loading

Este manual también es adecuado para:

Worksense mason peak 427836