Descargar Imprimir esta página

Fimar MCD/260E Uso Y Mantenimiento página 56

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 123
▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬ BELL PACKAGING MACHINE MCD
Operation with inert gas intake.
1. Connect the inert gas bottle to nozzle that
is on one side of the equipment.
2. Press main switch (A) (MCD - MCD/S) or
operate
selector
activate
the
equipment.
3. Press the button (B) to start the
appliance.
4. Press buttons (E-F) to select the working programme.
5. Insert the food product into bag.
6. Insert the bag into decompression chamber with the bag opening positioned on sealing
bar.
To package liquid products, fill the bag to the maximum level up to 50% of their capacity
EN
and position them so that the opening is on sealing bar , while the product must be at a
lower level, inside the chamber, thus avoiding the product discharge.
7. Insert nozzles (K) to blow gas into the bag opening.
8. Lower holding bell and keep it in position until the equipment does not end up the
sealing cycle of the bag.
Important
During this operation, make sure that the food product inside the bag is as far as possible
from sealing bar.
Before packaging the products in vacuum mode, carry out some sealing tests on empty
bags.
It is recommended to use "smooth" bags.
Caution - Precaution
Do not use the equipment to package pointed products.
If it is the first time the appliance is used, remove any protective linings and accurately clean
to remove any construction material residue before starting it.
(N)
(MCD/CS)
power
supply
of
to
the
- 24 -
K
English language

Publicidad

loading