Descargar Imprimir esta página

Fronius Smart Meter 240V-3 UL Manual De Instrucciones página 20

Ocultar thumbs Ver también para Smart Meter 240V-3 UL:

Publicidad

consecutively in the address range from 2 to 14. Different Fronius Smart Meter
power categories can be used together.
IMPORTANT!
Use no more than 3 secondary meters in the system. To avoid interference, it is
recommended to install the terminating resistors according to the chapter
minating Resistors
Position of the primary meter in the consumption branch. *Termination resistance R 120 Ohm
Position of the primary meter at the feed-in point. *Termination resistance R 120 Ohm
The following must be observed in a multi meter system:
-
-
Modbus parti-
The inputs M0 and M1 can be freely selected. A maximum of 4 Modbus parti-
cipant - Fronius
cipants can be connected to the Modbus terminal on the inputs M0 and M1.
GEN24
IMPORTANT!
Only one primary meter, one battery and one Ohmpilot can be connected per in-
verter. Due to the high data transfer of the battery, the battery occupies 2 sub-
scribers.
20
on page 16.
Each Modbus address is assigned only once.
Place the terminating resistors individually for each channel.
Ter-

Publicidad

loading

Este manual también es adecuado para:

Smart meter 480v-3 ulSmart meter 600v-3 ul