Descargar Imprimir esta página

Fronius Smart Meter 240V-3 UL Manual De Instrucciones página 28

Ocultar thumbs Ver también para Smart Meter 240V-3 UL:

Publicidad

1
2
3
4
5
The network wizard and the product setup can be carried out independently of
each other. A network connection is required for the Solar.web installation wiz-
ard.
Configure Froni-
1
us Smart Meter
as primary meter
2
3
4
5
6
7
8
9
The Fronius Smart Meter is configured as a primary meter.
Configure Froni-
1
us Smart Meter
as a secondary
meter
2
3
4
5
6
7
8
9
10
28
Establish a connection to the inverter (LAN1) with a network cable (CAT5
STP or higher).
Open the access point by touching the sensor once
flashes blue.
In the browser address bar, enter and confirm IP address 169.254.0.180. The
installation wizard is opened.
Follow the installation wizard in the individual sections and complete the in-
stallation.
Add system components in Solar.web and start up the PV system.
Call up the website of the inverter.
-
Open web browser.
-
In the browser's address bar, enter the IP address (IP address for WLAN:
192.168.250.181, IP address for LAN: 169.254.0.180) or enter and con-
firm the host and domain name of the inverter.
-
The website of the inverter is displayed.
"Device configuration"
Click on the
Log in to the login area with user
Call up the
"Components"
Click on the
"Add components"
Set the position of the meter (feed-in point or consumption point) in the "Po-
sition" drop-down list. For more information on the position of the Fronius
Smart Meter, see
Positioning
Set the converter ratio and the network type.
Click on the
"Add"
button.
Click the
"Save"
button to save the settings.
Call up the website of the inverter.
-
Open web browser.
-
In the browser's address bar, enter the IP address (IP address for WLAN:
192.168.250.181, IP address for LAN: 169.254.0.180) or enter and con-
firm the host and domain name of the inverter.
-
The website of the inverter is displayed.
Click on the
"Device configuration"
Log in to the login area with user
Call up the
"Components"
Click on the
"Add components"
Select the meter type (generator meter/load meter) in the
down list.
Enter the previously assigned address in the
Enter the name of the meter in the
Set the converter ratio and the network type.
Select the category (generator or load) in the "Category" drop-down list.
button.
"Technician"
and the technician password.
menu area.
button.
on page 7.
button.
"Technician"
and the technician password.
menu area.
button.
"Modbus address"
"Name"
input field.
→ Communication LED:
"Position"
drop-
input field.

Publicidad

loading

Este manual también es adecuado para:

Smart meter 480v-3 ulSmart meter 600v-3 ul