Descargar Imprimir esta página

Garland PRESS 191 AE Manual De Instrucciones página 28

Publicidad

English
Always carry out all the maintenance
work with the machine unplugged from
the mains.
7.1. MAINTENANCE
This pressure group does not need any maintenance
work. We strongly recommend a general visual control
to check for water leakages, loose parts and to check
all the connections. This way, you shall ensure a long
lasting usage of the machine. Should you detect any
anomalies, rework or take the machine to your nearest
service agent.
28/92

Publicidad

loading

Este manual también es adecuado para:

Press 391 ae