Descargar Imprimir esta página

KALLISTA P22121 Guia De Instalacion página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

Valve Inlet
Supply Tube
Shut-off
Valve
6. Supply Connections
Install the water supply shutoff valves according to the
manufacturer's instructions.
Connect the supply tubes to the valve inlets and supply shutoff
valves. Left is HOT and right is COLD.
Tighten all connections.
7. Installation Checkout
Connect the tailpiece and P-trap (not supplied).
Ensure all connections are watertight.
Remove the aerator assembly by turning it counterclockwise.
Open the drain. Open the main water supply and check for leaks.
Repair as necessary.
Open both hot and cold valves and run water through the spout
for one minute to remove debris. Check for leaks in the flexible
hose connections. Turn the valves off.
Install the aerator assembly.
1004811-2-A
All manuals and user guides at all-guides.com
Aerator
8
Kallista

Publicidad

loading

Este manual también es adecuado para:

P22221