Installation
11
8
1
5
Figure 9
1. Discharge tunnel
2. Capscrew (2)
3. Flat washer (2)
4. Lock nut (2)
5. Hex head washer screw
(1/2" long)
6. Hex head washer screw
(3/4" long)
6.
Discard discharge tunnel.
Install Conversion Kit
Install New Discharge Tunnel (Fig. 9)
1.
Position new discharge tunnel on deck. Align
holes in discharge tunnel with holes in deck.
2.
Fasten rear-left and rear-rights corners of tunnel
to deck using (2) capscrews, (2) flat washers and
(2) lock nuts previously removed. Fasten
front-right side of tunnel to deck using 1/2" hex
head washer screw previously removed. Fasten
front-left corner of tunnel and spring bracket to
deck using 3/4" hex head washer screw
previously removed.
EN–6
6
12
9
10
2
3
7
4
7. Spring bracket
8. Spring extension
9. Latch plate
10. Self-tapping screw (2)
11. Door retainer
12. Discharge door assembly
3.
Install new discharge door assembly and secure
with new door retainer.
4.
Install new latch plate to tunnel using (2) new
self-tapping screws.
5.
Hook one end of spring extension through hole
on spring bracket and the other end onto the
discharge door handle.
6.
Open and close discharge door to ensure that
discharge tunnel door closes when handle is
released.
Install New Engine
1.
Carefully set new engine onto housing.
2.
Install and tighten (3) new engine screws
(Fig. 10). Torque the engine screws to 250-400
in-lbs (28-45 N m).
1
2
Figure 10
1. Engine
2. Engine screw (3)