1
2
Vent valve
1
Condensation drain 16 mm
2
Water Return 3/8" M
3
Water Supply 3/8" M
4
For the correct connection to the manifold of the
embedded radiant cooling system and the setting of
the correct flow rate, please observe the relevant
installation instructions and the applicable local
regulations. The nominal flow rate of the water circuit
of this dehumidifier is 180 l/h.
Condensation drain
To prevent the formation of bad odours from the waste
water and to ensure the drainage of the condensate,
it is important to connect the condensation drain to a
siphon. To facilitate cleaning, mount the siphon in an
easily accessible place.
3
4
03.05
Power supply and control connection
Dimension
Power supply
minimum 3 x 1.5 mm², rigid
Attention: danger to life!
▪ The electrical installation may only be carried out
by an electrically skilled person. The electrical
installation must follow the applicable national
standards and guidelines as well as any specific
requirements of your local energy supplier.
▪ Before carrying out any work on the electrical
components, make sure that the power supply is
disconnected.
▪ The main power supply must be protected with
a residual-current circuit breaker.
▪ An electrical disconnect must be provided near the
unit to disconnect the power supply before
maintenance and cleaning.
▪ Care must be taken to ensure that the regulations
for electrical installations and equipment are fully
complied with.
▪ Check to ensure the supply voltage corresponds to
the rated data of the unit (voltage, frequency) on the
type plate of the machine.
▪ Earthing is mandatory and must be connected first
during installation.
Loosen the two screws of the electronics box and
carefully remove the cover with the display.
13
EN
Connection
Terminal