Descargar Imprimir esta página

voestalpine Bohler welding URANOS 1500 TLH Manual De Instrucciones página 45

Ocultar thumbs Ver también para Bohler welding URANOS 1500 TLH:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 104
Type of measure
40
0
1
2
Machine ventilation start temperature
41
99
Reset
6. MAINTENANCE
Routine maintenance must be carried out on the system according to the manufacturer's instructions. When the
equipment is working, all the access and operating doors and covers must be closed and locked. The system must
not be modified in any way. Prevent conductive dust from accumulating near the louvers and over them.
Any maintenance operation must be performed by qualified personnel only. The repair or replacement of any parts
in the system by unauthorised personnel will invalidate the product warranty. The repair or replacement of any parts
in the system must be carried out only by qualified personnel.
6.1 Carry out the following periodic checks on the power source
6.1.1 System
6.1.2 For the maintenance or replacement of torch components, electrode holders and/or
earth cables:
6.2 Responsibility
Failure to carry out the above maintenance will invalidate all warranties and exempt the manufacturer from any
liability. The manufacturer disclaims any responsibility if the user fails to follow these instructions. For any doubts
EN
IEC
and/or problems do not hesitate to contact your nearest customer service centre.
U.M.
A
X
V
41
MAINTENANCE
EN

Publicidad

loading

Este manual también es adecuado para:

55.07.041