Descargar Imprimir esta página

Svan SCPP600BX Manual Del Usuario página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION
WALL DRILLING AND BRACKET FIXING
Vertical reference line
As a first step, proceed with the following drawings:
 A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be fitted.
 A horizontal line A at 835-935 mm above the cooker top.
 A horizontal line B at a X mm above the horizontal line A.
 A horizontal line C at a 116mm below the horizontal line A.
Mark Points:
 Mark a point (1) on the horizontal line A, 80 mm to the vertical reference line.
 Repeat this operation on the other side , checking that the two marks are leveled.
 Mark a point (2) on the horizontal line B, 40 mm to the vertical reference line.
 Repeat this operation on the other side , checking that the two marks are leveled.
 Mark a point (3) on the horizontal line C, 155 mm to the vertical reference line.
 Repeat this operation on the other side , checking that the two marks are leveled.
40
(2)
B
40
80
80
(1)
A
155
C
(3)
155
EN-5

Publicidad

loading

Este manual también es adecuado para:

Scpp900bx