14. That the horizontal and diagonal braces are as-
eN
sembled and secured in the correct position.
15. That the stabilizers are correctly assembled.
16. That the tower is perpendicular (check using a
spirit level).
17. That the tower is stable.
18. That the platforms are situated in the correct
position and the wind security lock is secured in
place.
19. That the tower configuration is inspected fre-
quently (see inspection sticker).
20. That all locking pins are in place in the construc-
tion and that these are locked.
II.IV Inspection, Care and maintenance
1. Tower parts must be handled and transported
with care, in order to avoid damage.
2. Storage should be organised in such a way that
only undamaged parts, in the correct amounts,
are available for assembly of the tower.
3. Check all moving parts for correct functioning
and to ensure that these are not contaminated.
4. Check all parts for damage. Damaged or incor-
rect parts may not be used.
5. Damaged parts have to be returned to the manu-
facturer for inspection.
6. Towers for professional use must be inspected
annually for any defects by an expert. For a fee,
Altrex's department of Inspection, Repair and
Assembly can be used for inspections and, if re-
quired, repairs.
II.V Disassembly of the tower
The tower should be disassembled following the in-
structions for assembly but in reverse order.
Relax. It's an Altrex.
II.VI relocating the tower
• I n order to relocate the tower, the stabilizers have
to be raised to a maximum of 10 cm.
• T he wheel brakes are released by pressing the
brake pedal.
• W hen the tower is being relo-
cated, persons and/or materi-
als may not remain on the
tower, figure 6.
6
• B eforehand, checks should be
made that the environmental
factors, such as opening doors,
canopies, pits, automatically
functioning sun blinds, above-
ground electrical cables, traffic
and/or passers-by, etc. do not
pose the risk of dangerous
situations while the tower is
being relocated.
• O nly relocate a tower in the lengthways direction
or in the diagonal direction, manually, over a flat,
horizontal and sufficiently load-bearing surface.
Make sure that the tower does not start to slant
during relocation.
• I mmediately after relocating the tower, the wheel
brakes have to be applied and locked, by pressing
the brake pedal.
• A fter relocation, the tower has to once again be
horizontally aligned; this should be done using a
spirit level.
• O nce again adjust all of the stabilizers, so that they
are in contact with the surface.
II.VII Assembly and/or repair of
replacement parts
Replacement parts supplied by Altrex must be fitted
to the correct Altrex product and in the same way as
the part that is replaced. Assembly (attachment) and/
or repair is effectuated at the own risk and expense
of the client. Altrex is not liable for damage caused by
incorrect assembly and/or repair. Against payment,
Altrex can be called in for the repair of your product,
and/or the assembly of the parts in question.
II.VIII warranty Conditions
This Altrex product has been designed, manufac-
tured and tested with the greatest care. Should this
32 of 90