Descargar Imprimir esta página

Royal Catering RCIN-700-01 Manual De Instrucciones página 21

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 65
The oil drain tube is located in the cabinet under the unit. It should be installed when the used oil is to be
drained off.
Install the coupling element (optional) to allow the installation of a second fryer:
3.4.
Working with the device
1) Connect the device to the power supply - CAUTION! The appliance is delivered without a plug, you
should obtain such a plug on your own and have it installed by a qualified electrician.
2) Make sure that the oil drain located inside the cabinet is closed.
3) Turn on the device by pressing the ON/OFF button (6). The unit will go into standby mode and the
oil fill indicator (2) will light up. Fill the tank with oil intended for gastronomic use until the oil level
is between the maximum and minimum markings, then press the oil fill button (2). Now the unit is
ready for operation.
CAUTION! The device performs a self-test with each start-up. If there is no oil in the tank or it is not
enough, the overheating protection will prevent further operation. The overheating protection will
turn on the buzzer, light up the oil fill indicator and display the information about the lack of oil as
"— —" on the display.
EN

Publicidad

loading

Este manual también es adecuado para:

Rcin-700-02