6
5
ECO 30/2
4
3
2
1
0
100
130
BOILER ASSMBLY
ECO 22 - 22/2 - 30 - 30/2 - 40/2
Attach the flange 2 to the furnace with n° 4 screws (3) through the sealing gasket (4)
and any seals (5). Insert the burner in the flange so that the nozzle enters the combu-
stion chamber as indicated by the manufacturer of the furnace. Tighten the screw (1)
to lock the burner in place.
NOTE: If the burner 40/2, disassembly of the terminal stainless steel of the flame tube,
UK
and then thread the flame tube into the flange and replace the terminal.
34
ECO 30
160 190
220 250
280
1
3
2 5
ECO 40/2
310
340
370 400 430
4
460
490 520
550
kW
Heat output