Assembly Onto The Boiler; Flame Dimensions - Lamborghini Caloreclima EM 16 Manual Para La Instalacion Y El Mantenimento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY ONTO THE BOILER

Fix ange 2 to the boiler using 4 screws
burner in the ange so that the draught tube penetrates into the combustion chamber by the length suggested by the boiler
manufacturer. Tighten screw 1 to lock the burner in position.

FLAME DIMENSIONS

3 interposing the insulation gasket 4 and the possible insulating cord
The dimensions are indicative only being in uenced by:
- excessive quantity of air;
- combustion chamber shape;
- development of gas path in the boiler (direct/reverse);
- combustion chamber pressure.
A Flame diameter
B Flame length
C Test tube diameter
D Test tube length
- 10
-
5. Insert the

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Em 26Em26/2

Tabla de contenido