Descargar Imprimir esta página

GE GFDS175 Manual Del Propietário página 15

Ocultar thumbs Ver también para GFDS175:

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Instructions
STACKING THE WASHER AND
DRYER{if desired){cont.)
INSTALLING THE STACK BRACKET
KIT
STACKING KIT GEFLSTACK CONTENTS
(OPTIONAL ACCESSORY}
,o oj
I
o o
e 1----
17 Left hand bracket
04 #12 x 1" screws
17 Right hand bracket
174 #8 × 1/2" screws
04 rubber pads
TOOLS YOU WILL NEED
C1Phillips screwdriver
1__
C1GIoves
ClOpen-ended
wrench
C1Level
C1Pliers
INSTALLATION
PREPARATION
Remove the packaging.
Flatten the product carton to use as a pad to lay the
dryer down on its side. Continue using the carton to
protect the finished floor in front of
the installation
location.
I_] REMOVE THE DRYER LEVELING LEGS
A. Carefully lay the dryer on its side. Use the
packing material so you don't scratch the finish
on the dryer.
B.
Use an open-end wrench or pliers to remove the
dryer leveling legs.
r move
r_l INSTALL RUBBER PADS TO DRYER
BASE
Locate the 4 rubber pads in the parts package.
Remove the adhesive backing and firmly place
over each bracket where you removed the
leveling legs.
Place pads over
all four leveling
leg brackets
15

Publicidad

loading

Este manual también es adecuado para:

Gfds170