Descargar Imprimir esta página

GE AWCS08 Manual De Instrucciones página 11

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions
4. INSTALL THE AIR CONDITIONER
IN THE WINDOW
A. Mark the center of the window. Set the air
conditioner in the window so that is it centered.
Place the air conditioner so that front edge of
the bottom mounting rail is against the back
edge of the sill.
B. Bring the window down so that the front edge of
the top mounting is in front of the window. Make
sure that the air conditioner is level or tilting
slightly to the outside.
C. Extend the curtain panels until they fill the
window. Mark the location of the holes in each
corner. Use the drill and 1/8" drill bit to drill pilot
holes. Use 4 type B screws to secure the side
panels in place.
Type B screws
49-5000858 Rev. 0
5. SECURE AIR CONDITIONER
A. Loosen the screw on the right hand side of the
air conditioner near the bottom.
B. Slide a side bracket over the screw so that the
bracket is resting on the window sill. Tighten the
screw.
C. Use a 1/8" drill bit to drill a starter hole into the
window sill through the holes in the side bracket.
Use 4 type B screws to attach the side bracket to
the window sill.
D. Repeat the side bracket installation on the left
side.
11

Publicidad

loading

Este manual también es adecuado para:

Awcs10Awcs12Awcs14