Descargar Imprimir esta página

Pommier EXPAND Guía Para El Usuario página 21

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 45
5) Repair
Apply the general recommendations given on page 3.
For all installation/re-installation operations, refer to the installation instructions supplied with the product
Repair operations must be performed by qualified and accredited personnel. The standard practices of each
specialised trade (mechanics, hydraulics, electricity and pneumatics) must be respected.
Do not re-tighten connections under pressure.
Avoid any contact with hydraulic oil during these operations (during draining, collect this oil).
During post-maintenance testing, the operator must ensure that there are no personnel in the area in which
bar movements occur.
If the product needs to be re-painted, mask;
- the jack rods,
- the nameplate (CE marking – attached to the right-hand arm) and the pictograms so that they remain
legible.
6) Recommendations in the event of a failure
In the event of a split hose or a hydraulic leak between the balancing valve and the cylinder, use the
locking bolts located on the tube bracket to lock the bar in the required position.
For other types, do not continue driving until the necessary repairs have been carried out.
In the event of a failure of the bar deployment control or a sensor fault:
For the BAB type, place the bar in the driving position, open the drains and lock the bar in position using the
-
bolts with their pins (see above).
For other types (Expand, Hydden-up, BA (page 1)), do not continue driving until the necessary repairs have
-
been carried out.
21/66

Publicidad

loading

Este manual también es adecuado para:

BabHydden upBa