Descargar Imprimir esta página

Eaton 9PX 8000i HotSwap Manual De Instalación Y Usuario página 22

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 77
4. Power cables connection
10. Remove the Input Bypass AC jumper
.
4
11. Punch the Bypass AC Source knockout of the ModularEasy I/O cover
and insert the bigger provided
3
cable gland inside.
12. Insert the Normal AC source cable through the cable gland.
13. Connect the wires to the Normal AC source (Input) terminal blocks.
14. Insert the Bypass AC source cable through the cable gland.
15. Connect the wires to the Bypass AC source (Input BP) terminal blocks.
16. Insert the Output cable through the cable gland.
17. Connect the wires to the Output terminal blocks.
18. Tighten the cable glands.
19. Slide back and secure the ModularEasy I/O cover
with the two screws.
3
20. Check EBM connected to UPS.
21. Connect the two UPS together with the 9PX parallel cable and lock it.
Use of specific parallel cable is mandatory for first start up and optimal use.
Page 19
614-09354-01_EN

Publicidad

loading

Este manual también es adecuado para:

9pxmez6ki9pxmez11ki9px8kibp