Descargar Imprimir esta página

Daikin FTXP20N5V1B9 Manual De Instrucciones página 7

Ocultar thumbs Ver también para FTXP20N5V1B9:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 60
4.2
Operation range
Use the system in the following temperature and humidity ranges for
safe and effective operation.
Operation mode
(a)(b)
Cooling
▪ Outdoor temperature: –10~48°C DB
▪ Indoor temperature: 18~32°C DB
▪ Indoor humidity: ≤80%
(a)
Heating
▪ Outdoor temperature: –15~24°C DB
▪ Indoor temperature: 10~30°C DB
(a)
Drying
▪ Outdoor temperature: –10~48°C DB
▪ Indoor temperature: 18~32°C DB
▪ Indoor humidity: ≤80%
(a)
A safety device might stop the operation of the system if the unit
runs outside its operation range.
(b)
Condensation and water dripping might occur if the unit runs
outside its operation range.
5
Unit installation
5.1
Preparing the installation site
WARNING
The appliance shall be stored in a room without
continuously operating ignition sources (example: open
flames, an operating gas appliance or an operating electric
heater).
WARNING
The appliance using R32 refrigerant shall be stored so as
to prevent mechanical damage and in a well-ventilated
room without continuously operating ignition sources (e.g.
open flames, an operating gas appliance, or an operating
electric heater). The room size shall be as specified in the
General safety precaution.
5.1.1
Installation site requirements of the
indoor unit
INFORMATION
The sound pressure level is less than 70 dBA.
▪ Air flow. Make sure nothing blocks the air flow.
▪ Drainage. Make sure condensation water can be evacuated
properly.
▪ Wall insulation. When conditions in the wall exceed 30°C and a
relative humidity of 80%, or when fresh air is inducted into the
wall, then additional insulation is required (minimum 10  mm
thickness, polyethylene foam).
▪ Wall strength. Check whether the wall or the floor is strong
enough to support the weight of the unit. If there is a risk, reinforce
the wall or the floor before installing the unit.
▪ Spacing. Install the unit at least 1.8 m from the floor and keep the
following requirements in mind for distances from the walls and
the ceiling:
≥50
FTXP20~35N5V1B9 + ATXP20~35N5V1B9
Daikin room air conditioner
3P748643-1 – 2023.07
Operation range
≥50
(mm)
5.1.2
Additional installation site requirements
of the outdoor unit in cold climates
Protect the outdoor unit against direct snowfall and take care that the
outdoor unit is NEVER snowed up.
In heavy snowfall areas it is very important to select an installation
site where the snow will NOT affect the unit. If lateral snowfall is
possible, make sure that the heat exchanger coil is NOT affected by
the snow. If necessary, install a snow cover or shed and a pedestal.
5.2
Opening the indoor unit
5.2.1
To remove the front panel
1 Hold the front panel by the panel tabs on both sides and open
it.
a
Panel tabs
2 Remove the front panel by sliding it to the left or the right and
pulling it toward you.
Result: The front panel shaft on 1 side will be disconnected.
3 Disconnect the front panel shaft on the other side in the same
manner.
a
a
Front panel shaft
5.2.2
To re-install the front panel
1 Attach the front panel. Align the shafts with the slots and push
them all the way in.
2 Close the front panel slowly; press at both sides and at the
centre.
5.2.3
To remove the front grille
CAUTION
Wear adequate personal protective equipment (protective
gloves, safety glasses,...) when installing, maintaining or
servicing the system.
1 Remove the front panel to remove the air filter.
2 Remove 2 screws (class 20~35) or 3 screws (class 50~71) from
the front grille.
3 Push down the 3 upper hooks marked with a symbol with 3
circles.
5 Unit installation
a
Installation manual
7

Publicidad

loading

Este manual también es adecuado para:

Ftxp25n5v1b9Ftxp35n5v1b9Atxp20n5v1b9Atxp25n5v1b9Atxp35n5v1b9