Install and connect the machine
Turn the knob at the arm to release this. Pull it up to the desired height and turn it to
the right so it is not above the tank. Then tighten the knob again.
Make sure the tap at the back of the machine is closed. Manually fill the tank with de-
chalked water. Use de-chalked water, this to prevent unnecessary problems with
scurf.
Make sure the water level is at least 200mm.
Turn main switch on the back of the machine to the ON-position.
Switch the machine on, using the working-switch.
Check the rotation direction of the motor. If the motor turns in the wrong direction, the
platform will not move. To change the direction, interchange two phases in the
powerconnector.
Open the operation box and set the desired temperature for the water; see "Setting
of desired temperature".
Operation procedure
Place packaged products on the platform.
Hold the start button for 1 second. The platform with products will now automatically
descend into the water and rise again. The whole process takes approximately 3
seconds.
Take the products from the platform and this procedure can start again.
Setting of desired temperature
Press the "SET" button twice.
The adjusted temperature is displayed.
The shown value can be changed with help of the "UP" or "DOWN" button.
If no buttons are used within 10 seconds, the control unit will switch back to the
normal operating mode; the last entered temperature will be stored in the memory.
If the correct temperature is displayed, you have to push the "ON/OFF" or "FNC"
button twice to store the new value into the memory of the temperature control unit.
11