Descargar Imprimir esta página

Olsberg CTSC 14/522 Instrucciones De Montaje página 37

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Accessories
Floor-Standing Consoles
Olsberg Storage heaters can be mounted on floor-
standing consoles.
The height of the consoles is 100mm.
Please also read the Instruction Leaflet supplied with
the Floor-Standing Consoles.
Conversion kit feed cable,
alternating current 1/N/PE~230V
for 2 – 4kW
• Conversion kit for 2 + 3kW,
Feed cable with earthed plug for Belgium:
No. 14/5223.9210
• Conversion kit for 2 – 4kW,
Feed cable without plug:
No. 14/5243.9210
The conversion kits must be wired in accordance with
the circuit diagrams (see "Circuit diagram" chapter).
The enclosed circuit diagram for the conversion kit
must be pasted over the circuit diagram in the right-
hand side wall. When doing so, please take care to
avoid obscuring the serial number.
Conversion kit feed cable,
rotary current 3/PE~230V
for 2 – 7kW
• Conversion kit for 2 - 7kW,
without feed cable:
No. 14/4121.1540
The conversion kit must be wired in accordance with
the circuit diagram (see "Circuit diagram" chapter).
Please also observe the enclosed instructions. The
enclosed circuit diagram for the conversion kit must
be pasted over the circuit diagram in the right-hand
side wall. When doing so, please take care to avoid
obscuring the serial number.
Commissioning the Heater
Following tests must be carried out before com-
missioning the heater:
Insulation test with a voltage of at least 500V. The
dielectric resistance must be at least 0,5MOhm.
The electrical installer must measure the power
draw of the elements. This can be done using a
kW and time measurement or alternatively by
measuring the cold element resistance.
The value is to be compared with that of the rating
label or in the 'Technical Data' Section.
Note:
During the first charging periods the machine oils
various used in manufacture, as well as dust par-
ticles accumulated during manufacture and stor-
age burn off, causing an unpleasant odour. Make
certain the room is well ventilated.
Re-assembly
Heaters that have already been in operation or have
been taken apart and repositioned must be re-
installed according to these instructions. The commis-
sioning tests described on this page must also be
carried out.
The first charging cycle after re-assembly must be
monitored by the installer until the charge control
switches off the elements.
Any insulation parts which are, or seem to be, dam-
aged or have changed properties which could influ-
ence their function and safety, must be replaced.