Descargar Imprimir esta página

Diamond ADD-27/MX Manual De Instrucciones página 8

Ocultar thumbs Ver también para ADD-27/MX:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 47
3. Installation
After preparation for mounting, the device is to be placed in the designated room in accordance with the
system structure.
All inlets and outlets are to be connected on the water's side. The device connections are shown in the
following figure:
· Connect the inlet (1) and outlet (2) to water supply;
· Connect the elastic pipe (1/2') draining the sewage to the stub connector pipe (3) and to a sewage
grating or a draining installation.
· The sewage draining should be permeable enough to drain 20l/m of the flushing water. The draining
pipe should be stiff enough to avoid its breaking, which may cause blockage and result in the
overflow in the tank with the reagent as well as faulty regeneration process;
· Before water softener should be used mechanical sediment filter to protect device from mechanical
damage caused by sediments from water pipes.
The brine tank of the water softening device is to be filled with salt tablets.
Next add 15 liters of water using buckets ( ONLY FOR FIRST USE – later system automatically refill
the water during regeneration process) .
Check and tighten all fittings connecting the device.
Connect to electric Power socket.
The device is factory adjusted. The fine tuning is done by the user on site.
Before launching the current time should be set and the water hardness in installation place.
The Valve is preset for the regeneration at 2 a.m. for 20oGH. Depending on the water hardness
set the appropriate number of German degrees in valve.
Open the water supply to the water softening device.
The water pressure must be at least 2,0 bars and a maximum of 6,0 bars.
De-aerate system by initiate the regeneration. After first regeneration step BW- backwash skip other
steps by pressing
the device is ready to work.
Picture 2. Steering valve connection
3
Drain ½"
1
Inlet of Raw
water ¾"
1. Inlet of raw water (3/4", elastic connection)
2. Outlet of treated water (3/4", elastic connection)
3. Drain (1/2", connection for elastic hose).
4. Power supply
button after each steps of regeneration. When valve will be back in inserv postion,
4
Power supply
2
Outlet of Treated
water ¾"
7

Publicidad

loading