Descargar Imprimir esta página

Mitsubishi Electric MXZ-2B20NA Manual De Instalación página 6

Acondicionadores de aire de tipo dividido
Ocultar thumbs Ver también para MXZ-2B20NA:

Publicidad

Idiomas disponibles

Idiomas disponibles

3. FLARING WORK AND PIPE CONNECTION
3-1. FLARING WORK
1) Cut the copper pipe correctly with pipe cutter. (Fig. 1, 2)
2) Completely remove all burrs from the cut cross section of pipe. (Fig. 3)
Good
No good
* Put the end of the copper pipe to downward direction as you
Copper
907
ps
Levene .
remove burrs in order to avoid to let burrs drop in the piping.
(Se
3) Remove flare nuts attached to indoor and outdoor units, then put them
on pipe having completed
burr removal.
(Not possible to put them on
after flaring work.)
Tilted
Uneven
Burred
4) Flaring work
(Fig. 4, 5). Firmly hold copper
pipe
in the dimension
Fig. 4
Fig. 2
shown
in the table. Select A mm
from the table according
to the tool
you use.
Flaring tool
5) Check
a
Copper pipe
S
* Compare the flared work with Fig. 6.
Burr
Spare reamer
DO
¢ If flare is noted to be defective, cut off the flared section and do
[|
0
he
cutter &
[|
és
flaring work again.
|
|
Clutch type
Wing nut type
Fig. 3
Fig. 4
A
inside is shin-
Smooth all
ing without any
around
\
scratches.
.
ae
,
Lt"
Copper pipe
' ,
Die
"S\ Even length
*
all around
Flare nut
Fig. 5
Fig. 6
A
inch
Tightening
t
Pipe diameter
Nut
[mm (inch)]
ightening
torque
[mm (inch)]
(mm)
Clutch type tool
Clutch type tool
Wing nut type tool
Nem
kgfeem
ftlb
for R410A
for R22
for R22
26.35
(1/4)
17
1.51020
13.7 to 17.7}
140 to 180
10to 13
29.52 (3/8)
22
0to0.5
1.0 to 1.5
(0.06 to 0.08)
34.3 to. 41.2}
350 to 420 |
25 to 30
912.7 (4/2)
26
(0. to 0.02)
(0.04 to 0.06)
2.0 to 2.5
49.0 to 56.4]
500 t0 575 |
36 to 42
215.88 (5/8)
29
(0.08 to 1.0)
73.5 to 78.4}
750 to 800 |
54 to 58
3-2. PIPE CONNECTION
¢
Fasten flare nut with a torque wrench as specified in the table.
¢
When
fastened too tight, flare nut may
brake after a long period and
cause refrigerant leakage.
Outdoor unit connection
Connect pipes to stop valve pipe joint of the outdoor unit in the same
manner applied for indoor unit.
* For tightening, use a torque wrench or spanner and use the same
tightening torque applied for indoor unit.
Ve PGCE
When
installing the unit, securely connect the refrigerant
pipes before starting the compressor.
3-3. INSULATION AND TAPING
1) Cover piping joints with pipe cover.
2) For outdoor unit side, surely insulate every piping including valves.
3) Using
piping tape (E), apply taping starting from the entry of outdoor
unit.
* Stop the end of piping tape (E) with tape (with adhesive agent at-
tached).
¢ When
piping have to be arranged through above ceiling, closet or
where the temperature and humidity are high, wind additional com-
mercially sold insulation to prevent condensation.

Publicidad

loading