Important Notes; Technical Specifications; Scope Of Delivery - Franke AQRE430 Instrucciones De Montaje Y Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 16
3.

Important notes

• Installation, commissioning and maintenance are to be performed only by a
qualified technician according to the instructions provided.
• Legal requirements and the technical connection regulations of the local water
supply companies must be complied with.
• Before assembling and installing the equipment, flush the supply pipes in accor-
dance with DIN 1988.
• Only use a 6 V lithium battery for the power supply.
• Forced flushing after 24 hours of non-use ensures the exchange of water in tap
lines and prevents the odour seal in the urinal drying out. This function can be
switched off with the optional remote activation unit. This function is switched on
at the factory.
• Use suitable cleaning agents that are not harmful to the fittings in a proper manner
and rinse with water after use. High-pressure cleaners must not be used for
cleaning.
• All rights reserved to make technical alterations.
4.

Technical specifications

Nominal diameter:
Flow pressure:
Calculation flow rate:
Flushing flow:
Flush water volume:
Flush duration:
Operating voltage:
Type of protection:
5.

Scope of delivery

Quantity
1
1
1
1
1
4
DN 15
1.0 – 4.0 bar
0.30 l/s
0.30 - 0.70 l/s
2 – 4 l adjustable
0.6 – 6.5 s (adjustable in 6 steps)
6 V lithium battery CR P2
IP 65
Description
Urinal flusher
incl. 6 V lithium battery and blockable flow
volume regulator
Flushing pipe
Urinal connector
Rosette
Installation and operating instructions

Publicidad

Tabla de contenido
loading

Tabla de contenido