Descargar Imprimir esta página

Pentair Fleck 5810 SXT Guia Del Usuario página 6

Ocultar thumbs Ver también para Fleck 5810 SXT:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 16
User Guide Fleck 5810-SXT
3.3.
Description and components location
3.4.
By-passing
If the system is equipped with a bypass and if a problem occurs, turn the valves to bypass the system as shown in the picture
below.
Normal operation
Softening system
In
4 .
Programming
A
Note:
The controller must be plugged to be programmed.
After 5 minutes without any button pressed, the unit returns to normal operation without saving.
4.1.
Basic programming
A
Note:
Menus are displayed in a defined and incremental order.
Day of Override
A
Note:
Determine the maximum number of days of operation without regeneration.
Regeneration time
A
Press
and
B
Select the number of days of Override with
C
Press
to validate the selection and advance to the next parameter.
A
Note:
Determine the time of regeneration.
D
Adjust the regeneration time with
E
Press
to validate the selection and advance to the next parameter.
6 / 28
Regeneration button
Up button
Display
Down button
Mixing device
Out
simultaneously for 5 seconds to enter the menus sequence.
and
and
.
.
Drain
Brine
Meter
Inlet
Outlet
In Bypass
Softening system
In
Out
Ref. MKT-UG-016 / A - 20.06.2017

Publicidad

loading