Descargar Imprimir esta página

Klarstein BIGBITE 10045552 Manual Del Usuario página 26

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

EN
26
INSTALLATION
Preparation
If you have an extractor to the outside, you can install
the extractor hood as shown in the picture on the
right. The flue should have a diameter of at least
150 mm and be made of enamel, aluminium or a
flexible, heat-resistant tube.
Switch off the device before installation and pull
the power plug out.
The extractor hood should be placed at a height of
65-75 cm above the hob.
Installation with exhaust air
Note: Observe the safety instructions for operating the unit when the air is
discharged to the outside. If the cooker hood is in operation at the same time
as an appliance that draws its energy from a source other than electricity, the
negative pressure in the room must not exceed 4 Pa (4 x 10-5 bar).
Installation with convection function
If you do not have an outside vent, install an activated carbon filter before using
the unit.
Important notes for the installation of exhaust air pipes
The following rules must be strictly observed to guarantee optimum air extraction:
Failure to follow these instructions will reduce the performance and increase the
noise level of the cooker hood.
Lay the exhaust pipe as short and straight as possible.
Do not use a smaller exhaust pipe and do not constrict it.
When using flexible pipes, the pipe must always be installed tightly in order to
minimise pressure loss.
All installation work must only be carried out by a qualified electrician or a
qualified person.
Do not connect the hood's exhaust pipe to an existing ventilation system that
is being used for another device, such as a fireplace.

Publicidad

loading

Este manual también es adecuado para:

Bigbite 10045553Bigbite 10045554Bigbite 10045555