IMPORTANT NOTICE
For detailed instructions, download the Sievers
M500 Online TOC Analyzer manual from www.
sieversinstruments.com [Customer Support > Sievers
Analyzers & Instruments > Under "Manuals and
Validation Support Packages (VSPs)," Sievers M500].
Warnings
See the separate "Warnings" document for additional
important information.
•
The iOS system and vial ports contain sharp needles
designed to pierce the septa of sample vials. Do not put
fingers or inappropriate materials into the iOS system or vial
port.
•
To avoid false TOC readings and possible damage to the
Analyzer, always make sure the sample inlet is open and the
DI water reservoir is filled BEFORE turning on the Analyzer.
Always close the door of the iOS System when not sampling
from a vial.
•
RISK GROUP 3 Warning: UV emitted from this product.
Avoid eye and skin exposure to unshielded product.
This symbol on the instrument indicates that
the product does contain restricted substances
included in China RoHS II. Please refer to the
following table.
Please Note: This product contains a UV Lamp (with Hg)
which meets the exemption defined in Annex III 4(a) of RoHS
Directive 2011/65/EC.
Installation Instructions
Step 1: Unpack and inspect the Analyzer.
Step 2: Complete the identification records.
© 2023 Veolia. All Rights Reserved.
Sievers* M500
Online TOC Analyzer
Quick Start Guide
Step 3: Select a location for the Analyzer.
1. The Sievers M500 Online TOC Analyzer is
designed to be mounted on a wall or support
stand. It has pre-installed mounts that create
a minimum 2.5 cm between the back of the
Analyzer and the wall for heat dissipation. Allow
at least 30.5 cm of clearance on the sides, top,
and bottom of the Analyzer for the plumbing and
electrical connections. Additionally, this clearance
provides for the proper circulation for temperature
and humidity control. When selecting the location,
mount the Analyzer so that the display screen is
approximately at eye-level.
2. Select and procure hardware for mounting the
Analyzer on a wall or instrument rack, based on
site-specific circumstances. Mounting hardware
must be able to support four times the weight of
the unit [65.2 kg (144 lbs)].
3. Avoid direct sunlight and extreme temperatures.
Operating at elevated temperatures greater than
40 °C (104 °F) prevents proper operation, and
operating at temperatures lower than 5 °C (41 °F),
can cause measurement errors.
Step 4: Install I/O control wiring and power.
Step 4A: Access wiring areas
(Use ESD protection while
working inside the Analyzer)
1. Unlock and push the release
button to unlatch and open
the door to the Analyzer.
2. Remove the electronics
cover (Figure 1, at A) and I/O
Control wiring cover (B) by
turning the fasteners 1/4 turn
to release.
Step 4B: Install I/O wiring.
1. Locate the instrument
controller board (Figure 2, at
C) and wire glands (D) inside
the Analyzer.
2. Route the I/O wires into the
instrument through the wire
glands from the outside I/O
panel, located on the left side of the Analyzer.
1
*Trademark of Veolia; may be registered in one or more countries.
English
English
Figure 1 - Covers
Figure 2 - I/O Wiring
Areas
DQS 78000-03 MUL Rev. A