Descargar Imprimir esta página

Klarstein BRISA 10041402 Manual Del Usuario página 29

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION
Installation with exhaust air
Note: Observe the safety instructions for operating the unit when the air is
discharged to the outside. If the cooker hood is in operation at the same time
as an appliance that draws its energy from a source other than electricity, the
negative pressure in the room must not exceed 4 Pa (4 x 10-5 bar).
Installation with convection function
If you do not have an outdoor extractor, you do not need an exhaust air pipe. The
installation corresponds to installation with external ventilation.
Preparation
If you have an extractor to the outside, you can install
the extractor hood as shown in the picture on the right.
The flue should have a diameter of at least 150 mm
and be made of enamel, aluminium or a flexible, heat-
resistant tube.
Switch off the device before installation and pull
the power plug out.
The extractor hood should be placed at a height of
65-75 cm above the hob.
During installation, the minimum distance between the hob and the cooker
bonnet must be strictly observed and the numbering of the work steps as well as
the additional instructions must be followed.
Installation with exhaust air to the outside
The vapours are extracted with an exhaust air hose attached to the connection
ring.
The diameter of the exhaust hose must match the diameter of the connection
ring. If a smoke check valve is used or planned, it must be checked that it can be
opened and closed easily after the exhaust air hose has been installed. The cooker
hood can be equipped with one (top) or two (top and rear) exhaust openings.
Generally, the cooker bonnet is initially equipped for use of the upper extractor
opening as a extractor bonnet. The openings that are not needed are covered with
a plastic cover. This plastic cover can be easily removed by turning it anticlockwise
and optionally attached to another opening that is not needed.
EN
29

Publicidad

loading