INDEX
1. GENERAL INFORMATION
1.1 Introduction to this manual
2. SAFETY
3. TECHNICAL DATA
3.1 Technical data table and CE marking
3.2 Technical drawing with overall dimensions and hole spacing
4. PRELIMINARY CHECKS FOR INSTALLATION
4.1 Calculation of the necessary force
4.2 LIWIN L40 Slim flow rate - 350 in bottom hung inward, top hung outward and dome applications
4.3 Graph for determining the opening angle
4.4 Minimum installation dimensions
4.5 Contents of the pack
4.6 Tools necessary for installation of the actuator
4.6.1
Screws required for installation
5. INSTALLATION
5.1 Installation warnings
5.2 Minimum panel heights
5.3 Operating test
6. ELECTRICAL CONNECTIONS
7. ACTUATOR SYNCHRONIZATION
7.1 Manual synchronization
7.2 Synchronization via MOWIN APP
7.3 Chain strokes adjustment
7.4 Replacing a FAULTY ACTUATOR from a group of synchronized actuators
7.5 Adding or removing an actuator from a synchronized group
8. RESET PROCEDURE
9. DIAGNOSTICS
10. MOWIN APP
11. MAINTENANCE, EMERGENCY MANOEUVRES, CLEANING
12. ENVIRONMENTAL PROTECTION
13. FAQs (Frequently Asked Questions)
14. WARRANTY
15. DECLARATION OF INCORPORATION (for a partly completed machine) AND EC DECLARATION OF CONFORMI-
TY
28
29
29
29
30
30
31
32
32
33
34
37
38
38
38
38
38
44
44
45
48
48
48
49
49
49
50
50
50
51
51
51
52
53