ENGLISH
Install the 2 gables, front and rear (parts K) in the notches provided on the upper side
planks. The length and height may vary by ± 5 mm. Fit the 3 purlins, the ridge purlin and the
2 intermediate purlins (parts G and G1).
ATTENTION! Each purlin is designed to be perfectly aligned with the gables. Check
the slope of each purlin to ensure it is correctly positioned.
Consolidate the construction with the 4 storm battens (parts S) fixed from the inside to the
front and rear walls using M8x60 bolts. These pieces will be screwed on after tightening
the planks that form the side walls and the planks and gables at the front and rear of your
shelter.
NOTE :
ظThe storm battens must only be screwed against the bottom plank at the bottom and the
first plank of the gable at the top;
ظThe M8x60 bolts must not be over-tightened to allow the planks to work.
⑥
FITTING THE DOORS
ITEM
DESCRIPTION
I
Right and left door (semi-glazed)
Place the 2 doors (part I) on the hinges.
I
I
I1
35
I1
I2
I
I
I3
DIMENSIONS (MM)
700 x 1850 mm
QTY
2