Descargar Imprimir esta página

probst STS-43-EH-23 Instrucciones De Uso página 34

Ocultar thumbs Ver también para STS-43-EH-23:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 126
Operation
4.2
Equipment handling
Before starting work, always check that the battery is fully charged and that there is sufficient
hydraulic oil in the oil reservoir (→ see chapter "Before starting").
To prevent the implement from rolling away unintentionally, apply the parking brake of the front
wheel. In addition, work is only permitted on level and horizontal ground!
51200081
Using the hand crank
blade upwards as far as necessary until the
split material fits between the blades (see
scale for stone height (in cm/inch)).
Place the split material (stone) centrally on
the support table of the unit and, if necessary,
align it accordingly using the scale (45° angle
ca. 5 mm
or measurements in cm and inches) on the
support table. 
Using the hand crank
blade down so far that there is still a gap of
approx. 5 mm between the upper blade and
the material to be split (stone).
10 / 16
Split material (stone) must
always be positioned and split
in the CENTRE OF THE unit!
Off-centre splitting will
damage the unit.
, crank the upper
, crank the upper
GB

Publicidad

loading

Este manual también es adecuado para:

51200081