Descargar Imprimir esta página

Kohler K-5548-K1-TT Guía De Instalación Y Cuidado página 14

Publicidad

Idiomas disponibles

Idiomas disponibles

78" (1981 mm)
Black Straight-
Through Cable
3-Way Straight
Control Cable
Coupler
Input (Location
Varies By Model)
10" (254 mm)
Black Straight-
Through Cable
Steam Adapter
16" (406 mm) White
Crossover Cable
6. Install the Adapter – Dual Steam Head
Remove the adhesive backing from the steam adapter.
Mount the adapter firmly to the side of the steam generator.
NOTICE: Do not pinch, nail, wedge, or use undue force when
handling the white crossover cable. Any damage may result in
adapter failure. If the adapter is not installed immediately, protect
the cable ends with tape or other shielding material.
NOTE: The terminator should be installed if no additional
equipment is to be added in series to this device. If additional
equipment is to be connected downstream of this device, remove the
terminator and follow the instructions packed with the additional
equipment.
Apply dielectric grease in all the connectors and wires.
Connect the 16" (406 mm) white crossover cable to the steam
adapter and the inlet side of the 3-way coupler.
Connect the 10" (254 mm) black straight-through cable to the
output side of the 3-way coupler and the first generator.
1235393-2-E
Controller
25' (7.6 m)
Data Cable
14
Steam
Head
Temperature
Sensor
Steam
Head
Interface
Kohler Co.

Publicidad

loading

Este manual también es adecuado para:

K-1737-k1-cpK-1838-k1-cpK-5548-k1-cpK-5549-k1-cp