Descargar Imprimir esta página

Kohler K-5548-K1-TT Guía De Instalación Y Cuidado página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

X
Subtract 1-1/4"
(32 mm) from the
marked length.
X
Apply
thread
sealant.
3. Install the Steam Head(s)
NOTICE: Do not obstruct the steam head with shut-off valves,
plugs, or caps.
Subtract 1-1/4" (32 mm) from the marked length on the
temporary nipple to determine the appropriate nipple size.
Choose a nipple length within 1/8" (3 mm) of the appropriate
size.
Apply thread sealant to one end of the nipple and thread into the
housing until hand tight.
Apply thread sealant to the other end of the nipple.
Position the gasket onto the housing so it will sit between the
finished wall and the housing flange.
Use a 1" socket to thread the housing into the elbow.
Make sure that the gasket is compressed to achieve a good seal
around the housing.
If needed, use an appropriate sealant to achieve a watertight seal.
Press the steam head into the housing with the well positioned at
the top.
Kohler Co.
Elbow
Gasket
Housing
Apply thread
sealant.
9
Well
Flange
Steam Head
1235393-2-E

Publicidad

loading

Este manual también es adecuado para:

K-1737-k1-cpK-1838-k1-cpK-5548-k1-cpK-5549-k1-cp