Descargar Imprimir esta página

Grundfos OD 401 Instrucciones De Instalación Y Funcionamiento página 6

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 40
CONTENTS
1.
Applications
2.
OD 401 operator display
3.
Mounting
4.
Display design
4.1
Buttons and indicator lights
5.
Functions
5.1
Change of values
5.2
Lines with check mark
6.
Indications
6.1
Pop-up displays
7.
Communication with CU 401
8.
Electrical data
8.1
Conductors
8.2
Energy saving mode
9.
Technical data
10.
Dimensions
11.
Maintenance
12.
Disposal
Prior to installation, read these installation
and operating instructions. Installation and
operation must comply with local regula-
tions and accepted codes of good prac-
tice.
All wires to units outside the control panel
must be of the type H05VV-F according to
CENELEC HD21 (to avoid injury from
touching wires).
1. Applications
The OD 401 operator display offers an overview of
the system and the possibility of setting various
pump parameters and selecting from various instal-
lation types.
The number of pumps that can be monitored and
controlled depends on the modules in the system.
Note: When the system is started up for the first time
and if the OD 401 has been replaced, the OD 401
program must be loaded from the CU 401 control
unit. The program loading takes a few minutes.
6
Page
6
7
7
10
10
11
11
11
11
11
12
13
13
13
13
13
13
13

Publicidad

loading