Descargar Imprimir esta página

GE UVC9480 Manual Del Propietario E Instalación página 11

Ocultar thumbs Ver también para UVC9480:

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Preparation - UVC 9420
CABINET STRUCTURE
It is required two 2 x 4 horizontal studs separated
by 39" as part of the cabinet. They must be firmly
secured to the cabinet structure.
The cabinet bottom must be made from a wooden
surface ¾" minimum thickness.
WARNING
Make sure the studs and cabinet
bottom surface are firmly secured and able to
withstand 100 pounds.
CABINET PREPARATION
49-2000930 Rev. 2
2" Min.
2" Min.
39" Between
Studs
C L
FRONT VIEW
CUSTOM CABINET FRAME
The custom canopy or cabinet must have a
rectangular opening to accommodate the custom
hood insert by itself. This opening has the same
size for both a wall installation or an island
installation. Ensure parallelism and levelness of
the cabinet so that it doesn't affect flushness of
the hood with the cabinet.
21-1/4"
39"
13" from
bottom of
cabinet to
bottom of
house duct
Front of the
opening
recommended
to be 3" from
cabinet front
Back of
opening
recommended
to be 3" from
back wall
7-5/8"
C L
18-1/2" Min.
15"
SIDE VIEW
11

Publicidad

loading

Este manual también es adecuado para:

Uvc9420Uvc9420slssUvc9480slssUvc9480sl1ssUvc9420sl1ss