The handover document is the part of the documentation of the machine in which the manufacturer or
representative informs the buyer of:
1. the correct usage and major components of the machine;
2. the operation and handling of the machine.
The
manufacturer
commissioning of the machine (ATTACHMENT - 1) will be performed within 8 days
from the acquisition of the machine:
Machine details
Type:
Seller details
Address:
Repair shop details
Address:
Buyer details
Address:
The handover document is filled out by the chief or authorised service technician, who
sends a copy directly to SIP. With their signature, they guarantee the accuracy of the information.
The warranty is validated simultaneously with the validation of the service sheet.
The machine is correctly assembled and handed over to use – the commissioning has been performed.
The buyer has been acquainted with the usage, operation and handling of the machine.
______________________________
(customer signature)
HANDOVER DOCUMENT
or
manufacturer's
Receipt number:
Date of sale:
Selling prices (excl. VAT):
Person in charge:
Date of service:
Note:
Cultivated surface:
Meadows
Fields
Pastures
Tractor
STATEMENT:
representative
Year of manufacture:
______________________________
guarantees
that
Serial number:
Hectares
Type
(repairer signature)
the