Descargar Imprimir esta página

Hayward AquaRite UV Low Salinity Manual Del Usuario página 32

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 48
3e. Installation of the cell and the mechanical flow switch
pH probe
ORP probe
Flow switch
Probe
holder
Earthing
Temperature
anode
probe
Installation and connection of the cell (see diagram):
Install the cell mount vertically (if it is installed horizontally, please contact your installer
for an update of the unit programming).
Install the cell in a bypass.
Connect the power supply cable to the 4-pin terminal on the underside of the box, and
the gas detector to the RCA jack.
Installation and connection of the mechanical flow switch:
Install the flow switch mount before the cell and on the bypass.
Unscrew the white protective cover of the mechanical flow switch.
Screw the flow switch onto the 3/4" male thread.
Connect the red and black cables to the electronic circuit board terminals E and F.
AquaRite
UV LS
®
Only use spare parts supplied by Hayward brands
Liquid
acid
injection
Transparent
cell
Page 8 on 22
®

Publicidad

loading