3e. Installation of the cell and the mechanical flow switch
pH probe
ORP probe
Flow switch
Probe
holder
Earthing
Temperature
anode
probe
Installation and connection of the cell (see diagram):
•
Install the cell mount vertically (if it is installed horizontally, please contact your installer
for an update of the unit programming).
•
Install the cell in a bypass.
•
Connect the power supply cable to the 4-pin terminal on the underside of the box, and
the gas detector to the RCA jack.
Installation and connection of the mechanical flow switch:
•
Install the flow switch mount before the cell and on the bypass.
•
Unscrew the white protective cover of the mechanical flow switch.
•
Screw the flow switch onto the 3/4" male thread.
•
Connect the red and black cables to the electronic circuit board terminals E and F.
AquaRite
UV LS
®
Only use spare parts supplied by Hayward brands
Liquid
acid
injection
Transparent
cell
Page 8 on 22
®