3. Important Tips
√
√
The solar PV system is grid-tied. Please check if it is allowed in your area. we can remove this part.
√
√
√
The Hyper 2000 hybrid inverter should be protected from direct sunlight to prevent rapid
temperature increase.
Please check the required accessories before installation, as some accessories need to be
purchased separately.
€
After installation, please download the Zendure app to experience more smart features.
It takes about 1 minute to connect to the grid after completing the installation and first startup of
the Hyper 2000.
Use the Zendure app to set the AC output power to the home. Make sure it doesn't exceed the
safety power requirements of your country or region.
!
Please turn off the device (press and hold the button on the Hyper 2000 hybrid inverter for 6
seconds) and disconnect all power cables before removing.
4. What's in the Box
Hyper 2000 hybrid inverter
Bracket × 2
User Manual
M4 screwdriver × 1
3m 10A AC power cable
M4 Screw × 4
EN
4