Descargar Imprimir esta página

EVBOX Livo Manual De Instalación Y De Usuario página 9

Cable

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 123
Table of Contents
1. Introduction
1.1. Scope of the manual
1.2. Symbols used in this manual
1.3. Icons used in this manual
1.4. Certification and compliance
2. Safety
2.1. Safety precautions
2.2. Moving and storage precautions
3. Product features
3.1. Description
3.2. Technical specifications
3.3. Delivered components
4. Installation instructions
4.1. Prepare for installation
4.1.1. Plan for installation
4.1.2. Tools required
4.1.3. Power supply requirements
4.1.4. Optional: Dynamic load balancing
4.1.5. Only for Germany: Remote power control by DSO
4.2. Unpacking
4.3. Install the wall bracket and charging station
4.4. Connect the power cable
4.5. Charging station communication
4.5.1. Route communication cables
4.5.2. Optional: Connect Ethernet cable for Internet
4.5.3. Optional: Install SIM card for Internet
4.5.4. Optional: Connect dynamic load balancing cable
4.5.5. Only for Germany: Connect remote power control cable
4.5.6. Tighten the cable gland
4.6. Install covers
4.7. Configuration
4.7.1. Configure the charging station
4.7.2. Optional: Activate the charging station with CMP
4.7.3. Ready for use
5. User instructions
5.1. Start and stop a charging session
5.2. Status indication
5.3. Maintenance by user
6. Decommissioning
7. Appendix
7.1. Glossary
7.2. EU Declaration of Conformity
EN
7
7
7
7
8
8
8
10
10
11
11
13
13
13
13
15
15
17
17
17
19
21
26
27
27
28
29
30
31
31
34
34
35
35
35
36
36
38
38
38
39
39
5

Publicidad

loading