Descargar Imprimir esta página

Bergstrom INTEGRAL POWER II Instrucciones De Montaje página 19

Ocultar thumbs Ver también para INTEGRAL POWER II:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INTEGRAL POWER II
- Important: Any modification to ROPS/
FOPS, such as welding or drilling holes in the
structural members for mounting brackets, will
affect the ROPS/FOPS capability to provide
the required protection. Installing this product
may affect ROPS/FOPS systems.
Contact your authorized dealer to check
compatibility before making any modifications
or repairs. Failure to do so may void the
ROPS/FOPS certification. The manufacturer
of the roof air conditioner assumes no liability
whatsoever.
Tools required for assembly
- Torx wrenches set.
- Allen wrenches set.
- Open-jawed spanner 13.
- Scissors.
- Flexo-meter.
Associated documentation
- Quick guide: 1002455105
- User manual: 1002192411
- List of spare parts: 1003714500
- Troubleshooting: 1002192414
Dirna Bergstrom declares that the INTEGRAL
POWER unit complies with the requirements
of the following EC Directives and that
the harmonised standards and technical
specifications listed below have been applied:
- EC Directive 2014/53/EU
- EC Directive 2011/65/EU
- EC Directive 2014/30/EU
19
EN

Publicidad

loading

Este manual también es adecuado para:

1003714495