Note: If the installation will use the
AEIC35SB Ducted & Non-Ducted Flue
Kit skip to step 11.
FOR STOCK VERSION ONLY
8. Slide on the decorative upper arm
cover with four M4x8 machine screws.
Fig. 16.
9. Slide on the decorative cover tape
temporarily in place (you will need
to remove it when making electrical
connections). Fig. 17.
10. Slide the lower decorative arm and
temporarily tape in place. Fig. 18.
Skip to Step 18.
- 13 -
M4X8
MACHINE
SCREW (4)
FIG. 16
FIG. 17
FIG. 18