Hach LANGE WDMP sc Manual Del Usuario página 11

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Figure 4 Install and connect the probes
1 Protective plastic cap
2 pH probe
3 Plug for the optional probe port
4 Port for optional ORP probe
5 Conductivity probe
6 Connections on the junction box
Plumbing
The instruments on the panel are plumbed at the factory. Due to
shipping constraints, some tubes may need to be installed. Connect the
sample and drain tubing after the panel is installed.
1. Install the ½-inch OD tubing in the sample inlet
2. Turn the drain manifold so that the outlet drains down.
3. Install the ¾-inch ID tubing on the drain hose barb
Figure 5 Water panel plumbing
1 Sample inlet, open
2 Sample in tubing
position
(Figure
5, item 1).
(Figure
5, item 3).
3 Sample drain tubing
English 11

Publicidad

Tabla de contenido
loading

Tabla de contenido